Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Aguado, A, Caño, A d, de la Cruz, M P, Gómez, D and Josa, A (2012) Sustainability Assessment of Concrete Structures within the Spanish Structural Concrete Code. Journal of Construction Engineering and Management, 138(02), 268–76.

Art Chaovalitwongse, W, Wang, W, Williams, T P and Chaovalitwongse, P (2012) Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects. Journal of Construction Engineering and Management, 138(02), 277–86.

Beainy, F, Commuri, S and Zaman, M (2012) Quality Assurance of Hot Mix Asphalt Pavements Using the Intelligent Asphalt Compaction Analyzer. Journal of Construction Engineering and Management, 138(02), 178–87.

Cattaneo, S and Mola, F (2012) Assessing the Quality Control of Self-Consolidating Concrete Properties. Journal of Construction Engineering and Management, 138(02), 197–205.

Cha, H S, Kim, K H and Kim, C K (2012) Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential Apartments. Journal of Construction Engineering and Management, 138(02), 294–303.

  • Type: Journal Article
  • Keywords: Demolition; Sustainable development; Waste management; Residential buildings; Recycling; Case studies; Selective demolition method; Sustainable development; Renovation project; Waste minimization; Recycling;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000424
  • Abstract:
    In refurbishment projects, a great deal of waste from the existing buildings is generated at the demolition stage. By maximizing the amount of waste that is recycled or reused, the environmental impact from the refurbishing works can be minimized. As a solution for environmental impact minimization through maximizing reduction/reuse and recycling of construction debris, the Selective Demolition Method (SMD) has recently been introduced in the construction industry as an alternative to conventional methods. However, there has been a lack of in-depth analysis in terms of productivity, cost efficiency, and environmental impact. This study demonstrates a comparative analysis by quantifying the merits/demerits of the SDM method in a refurbishing residential project. After pilot-testing the SDM method in a real-case project using evaluation tools, including work sampling, a foreman survey, and worker interviews, the results showed that SDM method could lead to positive outcomes compared to the existing demolition method. Although the case study is merely a showcase for quantifying the two methods, the findings may positively support the benefits of the SDM method in terms of cost and environmental issues.

Cho, Y K, Bode, T, Song, J and Jeong, J (2012) Thermography-Driven Distress Prediction from Hot Mix Asphalt Road Paving Construction. Journal of Construction Engineering and Management, 138(02), 206–14.

Fan, S (2012) Modified Time Impact Analysis Method. Journal of Construction Engineering and Management, 138(02), 227–33.

Gambatese, J A and Rajendran, S (2012) Flagger Illumination during Nighttime Construction and Maintenance Operations. Journal of Construction Engineering and Management, 138(02), 250–7.

Jarkas, A M (2012) Influence of Buildability Factors on Rebar Installation Labor Productivity of Columns. Journal of Construction Engineering and Management, 138(02), 258–67.

Lingard, H, Cooke, T and Blismas, N (2012) Do Perceptions of Supervisors’ Safety Responses Mediate the Relationship between Perceptions of the Organizational Safety Climate and Incident Rates in the Construction Supply Chain?. Journal of Construction Engineering and Management, 138(02), 234–41.

Montemanni, R, Toklu, N E, Toklu, & & and Toklu, Y C (2012) Aggregate Blending via Robust Linear Programming. Journal of Construction Engineering and Management, 138(02), 188–96.

Nieto-Morote, A and Ruz-Vila, F (2012) Last Planner Control System Applied to a Chemical Plant Construction. Journal of Construction Engineering and Management, 138(02), 287–93.

Tserng, H P, Russell, J S, Hsu, C and Lin, C (2012) Analyzing the Role of National PPP Units in Promoting PPPs: Using New Institutional Economics and a Case Study. Journal of Construction Engineering and Management, 138(02), 242–9.

Wu, M, Wing Chau, K, Shen, Q and Yin Shen, L (2012) Net Asset Value–Based Concession Duration Model for BOT Contracts. Journal of Construction Engineering and Management, 138(02), 304–8.

Yang, I, Hsieh, Y and Kung, L (2012) Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning. Journal of Construction Engineering and Management, 138(02), 215–26.